|
Images
Audio Clips
Video Clips
Movies
Documents
|
 |

PRIMARY MISSION ACCOMPLISHED: 1969
Crew Activities, 1968-1969
Crews for the early Apollo manned missions were named in 1966, but their
assignments were canceled after the spacecraft fire in January 1967.
Mission-specific training languished for a while, but in early May 1967
the crew of Apollo 7 was selected and began preparing for their
earth-orbital mission. Deke Slayton, director of flight crew operations
at MSC, expedited training by assigning a third group of astronauts (a
support crew) to each flight. [see
Appendix 6] The support crew assisted the prime and backup crews in
training, doing a great deal of necessary but time-consuming work:
maintaining the flight data file (flight plan, check lists, and mission
ground rules); keeping the prime and backup crews advised of all
changes; helping training officers to work out procedures on the
simulators before the prime crews used them; and generally taking a load
of details off the prime and backup crews.1 Experience and seniority appeared to be the
major factors in Slayton's choice of crews. For the first three
missions, prime and backup crews were chosen from the first three groups
of pilots selected; all commanders had flight experience in Gemini.
Support crewmen were all from the fourth group of pilots.2 The scientist-astronauts, who ranked fourth in
seniority but last in experience, had varied assignments, participating
in design reviews and preflight tests and working on plans for Apollo
Applications experiments; geologist Jack Schmitt spent much of his time
working on site selection.3
1. Courtney G. Brooks, James M. Grimwood,
and Loyd S. Swenson, Jr.,
Chariots for Apollo: A History of Manned Lunar Spacecraft,
NASA SP-4205 (Washington, 1979), p. 261.
2. Ibid., pp. 261-62.
3. Interview with Joseph P. Kerwin, Jr.,
Mar. 29, 1985; interview with John R. Sevier, Apr. 24, 1986.
|