![]() ![]() | ![]() |
||||||||||||||||||||
|
| Orbit Number: | 137 |
|---|---|
| Data Downlink Rate: | 3600 bps |
| Spacecraft Spin Rate: | 12.09 rpm |
| Spin Axis Attitude: | Longitude: 226 deg Latitude: 88.1 deg |
| Trajectory: | |
| Periselene: | 90 km |
| Aposelene: | 110 km |
| Period: | 118 minutes duration |
| Occultations: | 35 minutes duration |
| Eclipses: | 15 minutes duration |
A total of 72 commands were sent to the Lunar Prospector spacecraft on Thursday night and Friday to set the gains for the Magnetometer and Electron Reflectrometer (MAG and ER) science instruments, and to move the downlink to the medium gain antenna from the Omni antenna (used to date). This served to increase the signal level by about 7 dB, improving the data return at the receiving ground stations.
In the way of upcoming events, a small spin axis attitude reorientation maneuver will be executed, during day shift on Monday, Jan. 26, followed by a spin trim.
David Morse
Ames Research Center
Moffett Field, CA 94035
|
SUBMENU
|